FRP Grating Installation Checklist: From Delivery to First Walk

The full install briefing on one page.

On delivery

  • Check panel count and numbering against the layout drawing before the truck leaves
  • Verify panel depth and mesh on sample panels — depth errors are visible instantly, resin errors are not
  • Store flat, on bearers, out of direct sunlight if storage exceeds a month (pigments are UV-stabilized; why test it)

Before laying panels

  • Confirm support centres against the load table's span basis — not the nominal drawing span
  • Check support flatness; shim before laying, not after
  • Mark span direction on pultruded panels — bearing bars perpendicular to supports, every time

Laying and fixing

  • Minimum 25 mm bearing per edge (40 mm preferred); overhangs ≤ 50 mm
  • 3–6 mm panel-to-panel gaps; ≥ 10 mm at walls
  • Clip pattern: corner clips at 4-panel intersections, edge clips at 600 mm, hold-downs at 1 200 mm
  • 316 stainless hardware only; snug torque — do not crush bars

Cut-outs and edges

  • Openings over 150 mm: add trimmer support — a cut-out is a bearing loss, not just a hole
  • Pultruded cut ends: end-cap or resin-seal
  • Molded cut edges: no sealing required — verify this clause didn't sneak into your spec

Handover

  • Walk the deck: listen for drumming (loose clips), feel for rocking (shimming skipped)
  • File: panel layout as-built, load table, mill certs, chemical confirmation

Expanded reasoning for each item lives in the full installation guide.