Skip to content
Factory-direct FRP grating & access systems · Nanjing, China njlf.frp@gmail.com  |  +86 25 8491 0966
JINGLUE
FRP Grating Systems
Standards & Testing · 2025-10-20

ASTM E84 Fire Ratings for FRP Grating: Class 1, Class 2 and Smoke

ASTM E84 is the most cited fire test in FRP grating specifications, and the most incompletely cited. Here is what it actually is.

How the test works

A 7.6 m (25 ft) specimen forms the ceiling of a tunnel furnace. An ignition source runs at one end with controlled airflow; instruments record how far flames travel relative to two calibration materials — red oak flooring (index 100) and inorganic cement board (index 0). Two numbers come out:

  • Flame Spread Index (FSI) — 0–100+ scale against the oak/cement calibration
  • Smoke Developed Index (SDI) — light obscuration on the same 0–100 scale, often reported 0–450+

The classes

Class (aka)FSI requirementTypical grating systems
Class A / Class 1FSI ≤ 25Fire-retardant vinyl ester; phenolic
Class B / Class 2FSI 26–75FR-additive ISO polyester
Class C / Class 3FSI 76–200Standard polyester

The smoke gap — and why it matters

“Class 1” constrains flame spread only. Vinyl ester FR panels reach FSI ≤ 25 with SDI commonly 450–750; phenolic reaches the same FSI with SDI of 10–50. In occupied escape routes, tunnels and offshore, that smoke difference is decisive — which is why serious specs carry an explicit SDI limit (≤ 450 is common; offshore often much lower).

What to demand on the certificate

  • FSI and SDI, for the delivered product's resin and thickness
  • Test lab identity and report number — verify it exists
  • Batch-level certification for project-critical orders, or third-party witness testing where the spec allows

One more honesty note: E84 measures surface flame spread, not structural fire endurance. FRP grating is not a fire-rated floor structure; it is a walkway with code-governed surface burning behavior. Specs that ask E84 to answer structural questions are misusing the test.

Get a Grating Selection and Price Within One Working Day

Send your span, loading and chemical environment — or a panel schedule — and we will confirm depth, resin and fixing detail with a factory-direct quote.

Request a Quote